|
|
|
SCHEDULE OF RATES AND CHARGES
Present Water Rates: |
| First 2,000 gallons |
$20.35 Minimum Bill |
| All over 2,000 gallons |
$6.70 per 1,000 gallons |
|
Present Sewer Rates: |
| First 2,000 gallons |
$12.79 Minimum Bill |
| All over 2,000 gallons |
$6.39 per 1,000 gallons |
|
Water Tap Fees: |
| ¾ inch tap |
$1,000.00 |
| 1 inch |
$1,500.00 |
| 2 inch |
$3,500.00 |
|
Residential Sewer Tap Fees: |
$1,200.00 |
Note: The cost of upgrade from one tap size to another will be the difference in cost of the respective taps as stated above. (I.e. upgrade from a ¾ inch tap to a 2 inch tap will be an additional $2,500.00)
Churches and community clubs will be charged the actual cost of installation of the tap in lieu of the full tap fee. This is a community service provided by the Department.
Should the cost of the installation of the tap exceed the tap fee, the additional cost will be borne by the customer. |
|
Other Fees: |
| Nonrefundable service fee |
$ 50.00 per connection |
| Renters Deposit |
75.00 per connection |
| Service Call Fee |
35.00 per service call |
| Returned Check Service Fee |
30.00 per returned check |
| Reconnection Fee |
50.00 per reconnects |
| Cut Lock Fee |
35.00 per cut lock |
| Tampering Fee (Water Theft) |
250.00 per occurrence |
| Late Payment Fee |
10.0% of water bill |
| Access Fee for Non-use Tap |
150.00 per meter |
| Developers Engineering Fee |
500.00 |
COMMISSIONERS
|
| Glen Thomas |
Chairman of the Board |
| Coleman March |
Vice Chairman |
| Chris Bateman |
| Eddie Burton |
| Joe Millsaps |
|
|